Providing Excellence Since 1998
0741 505 1613
Direct Site - 24hrs

01403 626 826
Horsham Office
London Office
0207 101 3883
CASE STUDY
Please note we periodically alter this page, updating our most recent Residential installations. Our full commercial portfolio is available on request. Our loft conversion portfolio covering our last 24 months is available on request.
Installation of Thrutone Slate Roof.


OUR WORK EXAMPLES
Installation of a Synthetic Slate roof and a Mortar Ridge System.


Replacement of an existing felt roof to a modern GRP flat roofing system.
*Please note customer requested to not have the leadwork altered
_JPEG.jpeg)

-
Removal of preexisting Redland 49 tiles and associated elements exposing the structural rafters. Removal of all flat roofing areas
-
Installation of new 18mm flat roofing OSB deck implementing expansion laps
-
Installation of new breathable felt underlay lapped as appropriate
-
Installation of new pre treated timber battens gauged appropriately for a Thrutone installation
-
Installation of Felt support trays
-
Installation of Thrutone slates fixed by copper nails and copper rivets
-
Installation of bilateral aluminium valleys lapped as appropriate
-
Installation of perimeter aluminium soakers
-
Implementation of double Thrutone slates whereby these areas would fail in the future using 600x300 dimensions
-
Installation of perimeter code 4 leadwork in accordance of LSA. Lead mechanically fixed to all parapet areas
-
Installation of external render beads and implementation of a render finish to all parapet wall areas. The top of the parapet walls where repointed as the installation of coping stones were not preferred by our customer.
-
The rear chimney stack was reduced in height due to several issues. The finished article was repointed and flaunched, with the chimney remaining ventilated of heat changes
-
Installation of a 3 layer torch on felt roofing system alternating the direct of each layers. All neighbouring elements heated through with evident bitumen bleeds
-
The main roofing ridge and the front small apex were finished in a mortar ridge system with the additional of grey mortar dye to assist with the cosmetic finishing
-
New white PVC fascias' and black half round PVC guttering was installed to finish this project.
On works completion there were no evident snags highlighted and we gained three additional jobs in the same street though positive recommendation. These works were completed by 5 staff members with all specialities on site. Works included a 10 year insurance backed guarantee.

Installation of a new dual liner flexi flue liner for a new appliance within a fire place.




Installation of a new deck and liquid rubber roofing system.
Installation of central Pivot Velux windows and lower glass planes to gain maximum light acrosss loft conversion floor


Installation of Velux Balcony Cabrio on a loft conversion including two neighbouring Velux

Slate dormer finished with a glass/ steel Juliet balcony


Installation of a Rear dormer loft conversion maximising the room in width and length. Conversion finished in a 20 year felt and small plain tile brown face.


Bespoke dormer pod created using a main fascia feature of Lead inc Lead welding










We are currently looking for highly experienced and qualified roofers and carpenters to join our team. Please see our criteria on 'join the team' page.